Request Offer

Kalium Lakes Limited

  • Kalium Lakes has completed a Bankable Feasibility Study (BFS) for the Beyondie SOP Project, aiming to commence production at 82ktpa of SOP, before ramping up to 164ktpa of SOP.
  • First production is anticipated in 2020 with an initial mine life of between 30-50 years. The Project has been designed to be a low cost, long life and high margin producer.